NOISE BARRIER IN POROUS CONCRETE IN NELAS (1st and 2nd PHASE)

The Farcimar Group constructed a Noise Barrier in Nelas, with Porous Concrete panels with absorbent characteristics, for the company Luso Finsa - Indústria e Comércio de Madeira, S.A.

The project consisted of the design and construction of a sound barrier in porous concrete, with a height of 5m and a length of 350m, totalling 1,750m2.
In this project, the foundation was constructed of support bases with a diameter of 0.50m and a depth of 2.90m, with a spacing of 5.00m between pillars.
The entire noise barrier was painted in accordance with the colour study for the lansdscape elaborated.
The management and execution of the work, whose main tasks included the inslallation of the prefabricated elements, was the responsibility of Arouconstroi, S.A.,with all the prefabricated concrete elements having been supplied by Farcimar, S.A.

Cookies help us to provide you a better service and to improve your experience. In using our services, you agree with our use of cookies.
Ok